Smart Tunnel Flood

During this mode the SMART Tunnel only functions as an ordinary motorway tunnel. Twitter pic KUALA LUMPUR.


Found By Benji Roebuck Architecture Construction Concrete

The pitter-patter of raindrops a sound often perceived as relaxing now causes.

. SMART flood tunnel operation modes. The 132m diameter tunnel consists of a 97km. March 7 2022 909 PM.

Since there is usually no flood most of the time the SMART Tunnel operates in Mode 1. Thursday 10 Mar 2022 358 PM MYT KUALA LUMPUR March 10 The management of Stormwater Management and Road Tunnel SMART Tunnel today said that it. The Stormwater Management and Road Tunnel SMART is the longest tunnel in Malaysia and the second longest stormwater tunnel in Asia.

The Smart tunnel is capable of storing three million cubic metres of floodwater at any time and diverted a total of five million cubic metres of floodwater in the December 2021. SMART tunnel mitigates 45 of KL floods 12 Feb 2022 The Star The recent torrential downpours throughout the peninsula saw the country battling one of the worst floods. A proposed SMART tunnel system may be the answer to ease Shah Alam residents woes.

The 97 km storm water tunnel motorway tunnel length is 4 km was built to solve the problem of flash floods in KL and its presence surely would have saved the capital city. Smart Tunnel Smarttunnel May 25 2022 The SMART tunnel management has just announced through its Twitter account that has completely closed to traffic in. SMART is the longest tunnel in the country and works on a four-mode system.

Sunday 19 Dec 2021 1029 PM MYT KUALA LUMPUR Dec 19 The Syarikat Mengurus Air Banjir dan Terowong Sdn Bhd SMART highway tunnel has set a new record of. The SMART tunnel in Kuala Lumpur goes into Mode 4 with the traffic deck closed to traffic. SMART Tunnel was fully closed to traffic on Saturday 18th.

According to SMART Tunnels statement this exceeded SMARTs capacity of 3 million cubic metres of water. Since it was opened to traffic in May 2007 the SMART tunnel has diverted floodwaters on 40. In its Mode 1 the SMART tunnel is a 4 km dual-deck roadinfrastructure that connects the areas of Jalan Istana and Kampung Pandan Kuala.

KUALA LUMPUR March 7 The Stormwater Management and Road Tunnel or SMART Tunnel has been completely closed to motorists due to flash floods here after heavy. The tunnel begins just before the confluence of the Klang and Ampang Rivers so that flood water can be diverted away from the. If the five million cubic metres of water had not been managed in time and efficiently areas in the heart of Kuala Lumpur such as around Masjid Jamek would have been severely flooded.

Other areas that are exposed to flood due to clogged drainage system or due to other rivers ie. What is Malaysias SMART tunnel. The areas covered by SMART Tunnel is around 45 of the total Kuala Lumpur flood prone areas.


Smart Malaysia Mott Macdonald Tunnel Boring Machine Geotechnical Engineering Malaysia


Smart Tunnel Kuala Lumpur Malaysia Floodlist Kuala Lumpur Malaysia Flood Mitigation